In order to keep you informed of the details and progress of the project, we list on this page key public access documents in 'most recent first' order. This section contains the main documents used as reference, and the JRC working documents. We welcome your comments and suggestions on these working documents, as this will help us improving them and take your views on board.
GPP Technical report (Final)
Technical report (Final)
2016-06-01
English
(6,17 MB - pdf)
GPP Procurement guidance (Final)
Procurement guidance (Final)
2016-06-01
English
(974,72 KB - pdf)
GPP 2AHWG 28/01/2015 – Technical presentation
2AHWG Road presentation
2015-01-01
English
(3,81 MB - pdf)
GPP criteria proposal (Draft v1)
GPP criteria proposal (Draft v1)
2014-12-01
English
(1,76 MB - pdf)
GPP Technical report (Draft v2)
Technical report (Draft v2)
2014-12-01
English
(9,42 MB - pdf)
GPP 1AHWG 12/03/2014 – Technical presentation
1AHWG Road Construction P2
2014-03-01
English
(1,92 MB - pdf)
GPP 1AHWG 12/03/2014 – Introduction on EU GPP Policy
1AHWG Road Construction P1 intro
2014-03-01
English
(472,41 KB - pdf)
GPP Technical report (Draft v1)
Technical report (Draft v1)
2014-02-01
English
(2,06 MB - pdf)
GPP Preliminary report (Draft v1)
Preliminary report (Draft v1)
2014-02-01
English
(6,91 MB - pdf)
GPP Preliminary report. Supporting documents (Draft v1)
Supporting docs for prelim.report
2014-02-01
English
(4,59 MB - pdf)